"I would describe my experience with FLINT using two words: commitment and communication. From the design process, through construction, to the eventual completion, every member of the FLINT team was committed to producing a high quality building within budget and on schedule. The team remained committed to being responsive to the school community throughout which brings me to communication. At no time, as the principal of Overfelt High School, did I feel uninformed about what was happening at the construction site on our campus. As a result, I was able to have confidence that the project was moving forward smoothly which allowed me to focus on running the school. The combination of commitment and communication gave me trust in FLINT as they completed the largest construction project on our campus since the school’s inception, now the most beautiful building in our community."
Vito Chiala
Principal
Overfelt High School
W.C. Overfelt High School New Music, Art and Administration Building
The new music, art and administration building houses a 200 seat theater; classrooms for music, art, photography and drama programs, including an 80 piece band room and a photo lab with a dark room. The project incorporates an existing one-story building, approximately 3,100 square feet, by modernizing, seismically retrofitting, and expanding the wood-framed structure. Another existing wood-framed structure and the connecting walkways was demolished to make way for the approximately 24,000 square-foot steel-framed performing arts center that revitalized the main entrance to the campus.
Project Value
$25 million
Square Footage
24,000
Delivery
Design-Build
Owner
East Side Union High School District
Architect
Recognition
- DBIA Western Pacific Region Award of Merit