Client Testimonial
"Let me take this time to thank FLINT as a whole for being a great partner on this project and this team specifically from the Project Manager(s), Superintendent(s), Project Engineers, etc., working so cooperatively with HMC Architects to create a cohesive team. With the limited budget that we have, expedited schedules, design and preference changes to accommodate time and money, unforeseen conditions, etc., this project could very well be contentious, but it absolutely is not. The FLINT Team has always been attentive to these challenges and have acted immediately to provide viable recommendations and resolve issues that do come up with the District's best interest in mind. That is truly and deeply appreciated by the WPUSD staff. We without reservation consider FLINT our top performing contract partner!!!"
Michael Adell
Director of Facilities
Western Placer USD
TWELVE BRIDGES HIGH SCHOOL | LINCOLN, CA
FLINT built a new high school on an approximately 56-acre site located at Twelve Bridges Drive and Fieldstone Drive in Lincoln, California. This project includes a 71,000-square-foot student center with a dance studio, drama studio, photography studio, video production studio, theater, stagecraft shop, band and choir rooms. The theater included tiered seating, fabric wrapped ceilings, wall treatments, and a full stage. The stagecraft shop is an area with tools and equipment for students to build set props, etc. for performances. The band and choir rooms contain modular sound-isolated practice rooms. The student center also includes full kitchen and a cafeteria/student center dining hall.
Project Value
$86 million
Square Footage
135,100
Delivery
Lease-leaseback
Owner
Western Placer Unified School District
Architect