Franchise Tax Board Tenant Improvement | Sacramento, CA
This renovation of two occupied two-story office and storage buildings included abatement, paint, flooring, restroom and kitchen finishes. Building 1 consisted of an addition of thirteen kitchenettes and two shower/locker rooms. An open-shaft exposed glass elevator was also installed as a functional focal point in the center of Building 1. Multiple floor-to-ceiling photo murals were installed in each building entryways. All new computer cables and wiring was installed for workstations with multiple added panels and transformers. Over 75% of the existing t-bar and ceiling tiles were replaced, with the remaining 25% cleaned and re-installed.
Project Value
$22 million
Square Footage
75,000
Delivery
Design-Bid-Build
Owner
State of California Department of General Services
Architect
Recognition
LEED Silver