“In my 27 plus years of doing negotiated, design-build, and hard bid work, FLINT has been the best team that I have ever had the pleasure to work with.”
Ray Pyle
Former Chief Facilities Planner
Contra Costa Community College District

Diablo Valley College Student Services Center  |  Pleasant Hill, CA

This extensive project was completed in six phases and included site demolition, construction of a student services building, demolition of the old student center, construction of a culinary arts building, demolition of the old cafeteria, and creation of a new commons plaza. The new student services center is a two-story building housing multiple academic departments, including admissions and records, student assessment, counseling, and international studies.

Key construction features include a structural steel frame with suspended concrete slabs over metal decking, a precast concrete panel exterior with multi-story curtain walls, and central heating, ventilation, and air conditioning systems serving both buildings. Additional features include chilled beam cooling and radiant floor heating throughout.

Project Value

$44 million

Square Footage

86,000

Delivery

Design-Bid-Build

Owner

Contra Costa Community College District

Architect

Steinberg Architects

Recognition

LEED Silver

 

< Back to Projects